HOME PAGE SUBSCRIPTIONS, Print Editions, News Bulletin PRODUCTS READ MINING NEWS ARCHIVE ADVERTISING EVENT READ THE PETROLEUM NEWS, EXTENSIVE ARCHIVES!

Providing coverage of Alaska and Northwest Canada's mineral industry
April 2017

Vol. 22, No. 16 Week of April 16, 2017

Mining News: Minto output down as mine looks beyond 2017

Capstone Mining Corp. April 11 reported that its Minto Mine in the Yukon produced 5,500 tons of copper during the first quarter. The company said grade for the quarter was lower than originally planned due to mine plan sequencing changes affecting timing of ore to the mill. A number of changes were made to optimize the mine plan in anticipation of the extension of operations at Minto beyond 2017 and to reduce re-handling costs. As a result, more low-grade, partially oxidized ore was directed to the mill causing recoveries to be slightly behind plan, offset by higher throughput. Capstone’s three producing mines – Minto, Pinto Valley (Arizona) and Cozamin (Mexico) – produced a combined 20,900 metric tons of copper, with additional by-products of zinc, molybdenum, lead, silver and gold.

-SHANE LASLEY






Mining News North - Phone: 1-907 522-9469 - Fax: 1-907 522-9583
[email protected] --- http://www.miningnewsnorth.com ---
S U B S C R I B E

Copyright Petroleum Newspapers of Alaska, LLC (North of 60 Mining News)(Petroleum News Bakken)(Petroleum News)(PNA)©2013 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.