NOW READ OUR ARTICLES IN 40 DIFFERENT LANGUAGES.
HOME PAGE SUBSCRIPTIONS, Print Editions, Newsletter PRODUCTS READ THE PETROLEUM NEWS ARCHIVE! ADVERTISING INFORMATION EVENTS

SEARCH our ARCHIVE of over 14,000 articles
Vol. 21, No. 13 Week of March 27, 2016
Providing coverage of Alaska and northern Canada's oil and gas industry

Arctic Directory March 2016: Fluor awarded PMI’s 2015 Project of the Year

Fluor Corp. said that the Project Management Institute has selected Chevron’s El Segundo refinery coke drum reliability project as its 2015 Project of the Year. Fluor served as the engineering, procurement and construction management contractor, in addition to performing initial studies and front-end design work.

The project replaced six coke drums and incorporated seismic upgrades to the coker structure at Chevron’s El Segundo refinery in California. The vertical project required extensive scaffolding and 15 major lifts that ranged from 166 tons to 500-plus tons, and took place at heights of more than 250 feet. The project was completed four months ahead of schedule, $7 million under budget, with no serious injuries and with no disruption to the plant’s operations.

The project team developed an innovative logistics plan to transport the new drums to the site - reducing the distance from 22 miles to 4.5 miles to minimize inconveniences to the community. Once at the site, old drums were removed and the new 95-foot-tall drums, which are three times as heavy as the Space Shuttle Endeavor, were installed. The project also removed a 1 million pound, six-derrick structure and cutting deck that covered the coke drums. The removal took place in one lift, with a 400-foot tall crane, the largest ever brought to Southern California.

The project used interactive planning sessions, safety commitment workshops, cutting-edge technology and strict scaffolding safety guidelines to complete with no serious incidents or lost-time injuries.



Did you find this article interesting?
Tweet it
TwitThis
Digg it
Digg
Print this story | Email it to an associate.

Click here to subscribe to Petroleum News for as low as $89 per year.


Petroleum News - Phone: 1-907 522-9469 - Fax: 1-907 522-9583
[email protected] --- http://www.petroleumnews.com ---
S U B S C R I B E

Copyright Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA)©2013 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.