Alyeska issues TAPS low flow reportTrans-Alaska pipeline heading for point at which mitigation measures will be needed to deal with several low flow rate issues By Alan Bailey Petroleum News
People have understood for some time that action will be needed to deal with various issues arising from the gradually slowing flow of oil through the trans-Alaska oil pipeline, as production declines from Alaska’s North Slope oil fields. But a report published on June 15 by pipeline operator Alyesk....
[additional news subjects in this story]
Mitigation needed Water separation likely Wax build up increasing Mitigation measures
You must be logged in to view this story. Please either log in or subscribe.
Click here to subscribe to Petroleum News for as low as $69 per year.
Subscribers log in here to read the entire newspaper (1998 to 06/24/2013)
Print this story | Email it to an associate.
Petroleum News - Phone: 1-907 522-9469 - Fax: 1-907 522-9583 [email protected] --- http://www.petroleumnews.com --- S U B S C R I B E
Copyright Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA)©2013 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.
|