NOW READ OUR ARTICLES IN 40 DIFFERENT LANGUAGES.
HOME PAGE SUBSCRIPTIONS, Print Editions, News Bulletin PRODUCTS READ MINING NEWS ARCHIVE ADVERTISING EVENT READ THE PETROLEUM NEWS, EXTENSIVE ARCHIVES!

Search our ARCHIVE
Vol. 21, No. 38 Week of September 18, 2016
Providing coverage of Alaska and Northwest Canada's mineral industry

Mining News: News Nuggets: Palmer road construction begins

Constantine Metal Resources Ltd. Sept. 13 provided an update on work programs at the Palmer project in Southeast Alaska, including the start of constructing a road to access the property’s Glacier Creek deposit. “A road to the mineral resource at Palmer is a major advancement for the project. It improves our ability to conduct ongoing exploration, environmental and geotechnical work, reduces dependency on helicopters, and enhances the safety of our employees,” said Constantine President and CEO Garfield MacVeigh. “It also highlights the excellent location and access of the project, which is 40 miles by paved highway and logging road to the deep-sea port town of Haines.” The 2016 exploration at Palmer included four reconnaissance exploration holes. Highlights from this drilling include a geologically significant 20.5-meter thick zone of chert and semi-massive pyrite intersected at the CAP prospect. Similar mineralization encountered at the South Wall and RW zones of the Glacier Creek deposit, which is located 2,500 meters to the northeast, transitioned to high-grade massive sulfide. Additionally, analysis by an independent structural geologist has provided new insight into the direction and sense of displacement of fault structures identified in the 2015 down-dip resource drilling that intersect and offset the lowermost portion of the South Wall zone. The work included review of the fault and adjacent rocks in drill core and on surface, and has produced new drill targets to test for extensions of the deposit. Mapping and sampling programs were completed at several areas throughout the property with the objective of advancing prospects to the drill stage. Results of this work will be summarized following receipt of assays.

-Shane Lasley



Did you find this article interesting?
Tweet it
TwitThis
Digg it
Digg
Print this story | Email it to an associate.

Click here to subscribe to Mining News North of 60 for as low as $89 per year


Mining News North - Phone: 1-907 522-9469 - Fax: 1-907 522-9583
[email protected] --- http://www.miningnewsnorth.com ---
S U B S C R I B E

Copyright Petroleum Newspapers of Alaska, LLC (North of 60 Mining News)(Petroleum News Bakken)(Petroleum News)(PNA)©2013 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.