HOME PAGE SUBSCRIPTIONS, Print Editions, News Bulletin PRODUCTS READ MINING NEWS ARCHIVE ADVERTISING EVENT READ THE PETROLEUM NEWS, EXTENSIVE ARCHIVES! SUBSCRIBE TO PETROLEUM NEWS -BAKKEN-

Providing coverage of Alaska and Northwest Canada's mineral industry
January 2015

Vol. 20, No. 2 Week of January 11, 2015

Mining News: News Nuggets: Progress report for Livengood

International Tower Hill Mines Ltd. Jan. 5 reported progress toward optimization of the Livengood gold project in Interior Alaska. The 2014 program included metallurgical work; mine production scheduling studies; power supply alternatives review; and alternative camp reviews. The company says this work has developed an improved production schedule, as compared to the project’s 2013 feasibility study and generated detailed work plans for 2015. These plans include additional metallurgical tests and engineering, including confirmation of the flow sheet and optimizing the operating costs. Once defined, the operating costs generated from this work will be used to evaluate and optimize the project configuration and capital costs, including determination of the optimum scale for the project. In order to better position Livengood for a construction decision when warranted by market conditions, environmental baseline studies continue at the project.






Mining News North - Phone: 1-907 522-9469 - Fax: 1-907 522-9583
[email protected] --- http://www.miningnewsnorth.com ---
S U B S C R I B E

Copyright Petroleum Newspapers of Alaska, LLC (North of 60 Mining News)(Petroleum News Bakken)(Petroleum News)(PNA)©2013 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.