North Slope Borough building gas pipeline to NuiqsutWill have less diesel to subsidize when village has access to natural gas; the borough and Kuukpik Corp. will not make a profit from gas distribution Kristen Nelson PNA News Editor
A gas cap will be built at the Alpine field with conditioned gas, officials representing the North Slope Borough told the Alaska Public Utilities Commission in a December presentation. In addition to gas injected back into the formation, approximately 500,000 cubic feet a day of gas will be piped to....
[additional news subjects in this story]
Unlicensed utility, win-win situation Shared construction Total costs of pipeline at $10 million
You must be logged in to view this story. Please either log in or subscribe.
Click here to subscribe to Petroleum News for as low as $89 per year.
Subscribers log in here to read the entire newspaper (1998 to 09/22/2019)
Print this story | Email it to an associate.
Petroleum News - Phone: 1-907 522-9469 - Fax: 1-907 522-9583 [email protected] --- https://www.petroleumnews.com --- S U B S C R I B E
Copyright Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA)©1999-2019 All rights reserved. The content of this article and web site may not be copied, replaced, distributed, published, displayed or transferred in any form or by any means except with the prior written permission of Petroleum Newspapers of Alaska, LLC (Petroleum News)(PNA). Copyright infringement is a violation of federal law subject to criminal and civil penalties.
|